Engineering Feasibility Study for the Proposed Klang Valley Mass Rapid Transit (KVMRT) Line 3
Circle Line and Selayang Links.
MESB took part in providing environmental input for the feasibility study with the intention of addressing environmental and socio-economic considerations within the recommended MRT3 corridor development options, in order to arrive at a preferred alignment option for both the Selayang Link and Circle Line.
